Logo

2007 release updates

 Availability of AMP Upload Function to PPR in December

Please note that the upload feature from Accreditation Manager Plus to the Joint Commission’s Periodic Performance Review site will be unavailable from 9:00 AM CT December 17, 2007 until 9AM CT January 2, 2008. During this time the PPR site will be undergoing upgrade to the new release. After the feature is enable on January 2 the PPR site will only accept uploads from the AMP 2008 Core Release. The 2008 Core Release will be shipped in December 2007 for locally installed versions and the Extranet will be upgraded before January 2. To ensure uninterrupted access to AMP in 2008 renew your subscription now.

2007 Update 3 Now Available

 Update 3 was released October 1. This release is a PDF of the refreshed -Comprehensive Accreditation Manual with the September update pages inserted. The updated pages include changes to the standards that will take effect January 1, 2008. There are no changes to the standards for scoring. The changes to the standards for scoring will occur with the 2008 Core Release which is available December 2007.

Instructions for updating the PDF manuals in locally installed AMP versions were e-mailed to primary contacts October 1st. The Extranet version was automatically updated with the new manuals.

If you need help in downloading Update 3 contact Technical Support at: 630-792-5420 or amp@jcrinc.com.

AMP 2007 June Release Data Migration Tables  These tables contain information about the Elements of Performance (EP) that have been changed since the release of the 2007 AMP Core in January 2007, as well as a description of how data associated with these EPs was migrated for this release.

©2002, 2003, 2004, 2005, 2006, 2007 Joint Commission Resources, Inc. - all rights reserved
Home Page Photo1
To Search for Products and Services, click here
Login
Login